Engineering Consultation
With nearly 40 years of experience, we can meet with your project team on-site at your facility (engineering, quality control, safety, production, and operators) to clearly define the application and the expected productive output of the project.
Installation Services
Positech can supply supervised installation (turnkey or partnership) with local contracted installation personnel or your internal maintenance personnel to assure a safe, efficient installation.
Integration Services
Positech can source and supply entire work cell solutions that may include lift assists, lift tables, conveyors, overhead rails, carts, fixtures, and other ergonomic solutions for a total project solution.
Operator and Maintenance Personnel Training
After a new piece of equipment or process is installed in your facility, it is very important that the operators, production people and maintenance personnel are trained to operate and maintain this installation safely and efficiently.
Planning & Layout Design
Positech can supply 2D and/or 3D layouts and profiles of the existing area and the product flow and production enhancement of the completed project.
Long-Term Service Support
Positech has 24-hour phone support, preventative maintenance services and spare parts support for the life of the equipment.
Case Studies
- Industry: Electronics
- Challenge: Electric/White Goods Handling
The cart has several shelves filled with electrical connectors. The application requires that the parts do not come in contact with each other as the cart is transferred in and out of the heat treat process.
- Industry: Paper
The spools have an inner and outer wall between them, which an end-effector could be inserted. However, the opening between the spool walls is curved and has spokes that create four quadrants and only a 3/4″ height into which an end-effector can be inserted. In addition to supporting the weight of the spool, the end-effector must slider the spool off the spindle.
- Industry: Appliances, Electronics, HVAC
- Challenge: Electric/White Goods Handling
Placing electric panels in the cabinets was labor intensive, requiring 2 or 3 people to place and secure the panels into the cabinets.
- Industry: Metal Fabrication
- Challenge: Cylindrical
The cylinders weigh between 50 to 100 lbs., 8″ – 10″ diameter and 48″ – 52″ long. 120″ of radial reach is required for three pick up and place points. The cylinders are up to 350° in temperature when the are brought to the work cell. Plant safety procedures require maintenance personnel must be able to service the electrical and hydraulic components from floor level.
- Industry: Automotive
- Challenge: Engine Handling
Existing hydraulic manipulator was not as effective at placing bars on the paint line hanger as a pneumatic manipulator would be. The “float” capability of a pneumatic manipulator and ease of maintenance convinced the customer to replace their hydraulic manipulator.
- Industry: Metal Fabrication, Tire
- Challenge: Castings
The part weights and the reach into the press made handling difficult. The customer used special fixtures and a forklift truck to do the transfer. Rotation was accomplished by setting the mold down and rotating it by hand, before picking it up again with the forklift. The transfer back to the press was very time consuming and much of the pre-heating was lost. This resulted in numerous castings being lost while the mold was reheating again during the process.
- Industry: Agriculture, Construction, Military and Defense
- Challenge: Engine Handling
Pins are transferred in and out of machining centers, each with its own clearance problems dictating where the pin can be gripped. Customer’s machine operators are apprehensive concerning manipulators. End-effector must be lightweight, simplistic, operator-friendly and safe to use.